Construction Specialties

Wall protection | Expansion joint covers | Entrance matting

+44 (0)1296 652800
Menu
  • Home
  • Products
    • Acrovyn® Wall & Door Protection
      Acrovyn® Doors & Door Protection
      Acrovyn by Design® Bespoke Wall Coverings
      Explovent® Safety Venting
      Explovent® Explosion Venting
      Omniwall Prefabricated Serviced Wall Systems
      Elimax Reform Flat Packed Serviced Wall Systems
      Allway® Expansion Joint Covers
      Entrance Flooring
      Pedisystems® Entrance Flooring
      Architectural Louvres
      Architectural Louvres
      Exterior Solar Shading
      Architectural Grilles
      Online Shop
      Conspec Contracts Installation Service
  • Projects
  • Blog
  • Resources
    • Brochures
      Best Practice Guides
      Market Sectors
      NBS Source Specifications
      CPD Seminars
      BIM Objects
      Acrovyn tutorials - FR
      Installation Service
      Legislation & Compliance
      On-Demand Webinars
      Virtual Product Samples
  • About Us
  • Contact
    • Nos Distributeurs
      Le fabricant
  • Careers

Leipzig South Combined Heat and Power Plant – Leipzig, Germany

Leipzig South Combined Heat and Power Plant

Leipzig, Germany

Leipzig South Combined Heat and Power Plant

Leipzig, Germany

About the Project

The Leipzig South Combined Heat and Power (CHP) Plant represents a significant milestone in Germany’s energy transition, setting a benchmark for low-emission energy production. Built on the site of the historic Ernst Thälmann power plant, the new facility combines advanced Siemens gas turbines with state-of-the-art burner technology, hot water generators, and catalysts, ensuring minimal nitrogen oxide and carbon monoxide emissions. With an overall efficiency exceeding 93%, the plant supplies heat and power to the city while maintaining environmental sustainability.

Design goals

Given the plant’s focus on sustainability and efficiency, the design team sought high-quality, durable ventilation solutions that could support essential airflow requirements while maintaining effective rain defence. The challenge was to ensure optimal ventilation in plant rooms while also providing a visually consistent design across the functional and screening areas of the building envelope. Additionally, the louvres needed to withstand the demands of a high-performance industrial setting while complementing the architectural vision of the facility.

Construction Specialties (CS) was engaged to provide a solution that balanced functionality whilst integrating seamlessly with the aesthetics across multiple parts of the facility.

Solution

To meet these requirements, CS supplied its RSH-5700AL Rain Defence Louvres, selected for their proven performance in maintaining airflow efficiency while providing robust protection against wind-driven rain ingress. Tested to the EN 13030, these louvres achieve Class A rain defence up to 3.0m/s while ensuring effective airflow in both intake and exhaust applications.

The louvres were required for three of the power plant’s buildings. In the Main Power Plant, finished in RAL 070 70 50 (Honeycomb Yellow), 110m2 of louvres span the West elevation. The RSH-5700 model features a recessed mullion at the joints between modules, creating a continuous line appearance on the façade.

Additionally, three areas of the rooftop plant level were fitted with the same model, even though the primary functional requirement in those areas was screening. The architect opted for the rain defence louvre to maintain a uniform aesthetic across the facility.

Rain defence louvres were also supplied for the Gas Supply Facility and the Pump House. Distributed across multiple sections, totalling approximately 135m²,  the louvres were polyester powder-coated in Rust (RAL 040 50 30) and Brick Brown (RAL 030 40 30) to complement the exterior envelope.

The project involved extensive collaboration between CS and the planning team to ensure optimal product selection and integration. These consultations were highly valued by the project stakeholders and played important role in achieving a well-coordinated implementation.

The final installation of CS louvres not only provided essential ventilation and rain defence but also contributed to the overall efficiency and resilience of the plant.

The facility was constructed in just over three years, opening on 23 October 2023. It now plays a key role in Leipzig’s plan to increase district heating coverage to over 50%, with future provisions to integrate hydrogen-based energy solutions.

What Next

GET BROCHURE
CONTACT US
REQUEST PRICING
ORDER A SAMPLE
ASK A QUESTION

Filed Under: Louvres, Projects Tagged With: Power Generation, Rain Defence Louvres, RSH-5700AL

Louvres

What's in the brochure
  • - Industry Leading Products
  • - Innovative New Design Options
  • - Detailed Technical Information
  • - Louvre Specification Guidance

+44 (0)1296 652800
sales@c-sgroup.co.uk
Order a Sample
Request an Estimate
Get Technical Help

Menu

  • CS Products
  • Projects
  • Blog
  • About us
  • Contact Us
  • Pick Country

Contact

Construction Specialties UK Ltd
1010 Westcott Venture Park
Westcott, Bucks, HP18 0XB
United Kingdom
Get Directions
Tel: +44 (0)1296 652800
Fax: +44 (0)1296 652888
Email: sales@c-sgroup.co.uk

Privacy

This website uses cookies to help us give you the best experience when you visit our website. By continuing to use this website, you consent to our use of these cookies. Find out more about how we use cookies and how to manage them below in our privacy policy.
Privacy Policy

Copyright © 2025 · Construction Specialties

Copyright © 2025 · Genesis Framework · WordPress · Log in